switch to roaster. Full electrical. That's realistic for operational roastric in Indonesia?
Counting the energy side: 1 kWh electricity is about 3,412 BTU. It means the need for power could be 12-18 kW just for healing element alone.
In Indonesia, the power of 12-18 kW takes at least 23,000 VA connections to the building. The cost of adding power could be significant, not to mention the cost of commercial costs that are not cheap.
Has anyone calculated the true TCO between gas versus electric gas for a 5-15-pound batch at the current state of the Indonesian power rate?